AS/NZS 4777.2:2020 is the standard every grid-connected inverter sold in Australia and New Zealand has to meet. It defines how an inverter must behave when the grid misbehaves: how fast it trips, when it must ride through a disturbance instead of tripping, how it supports voltage with volt-watt and volt-var response, and how it reconnects. For manufacturers, importers, test labs and network utilities, the practical question is what equipment you need to actually prove that behaviour on the bench. This guide explains what the standard asks for and the test equipment that reproduces it.

Why AS/NZS 4777.2:2020 Matters
The 2020 edition was published in December 2020 and became mandatory for new installations from 18 December 2021. To be eligible for small-scale technology certificates (STCs), an inverter must be on the Clean Energy Council's approved list, and that listing depends on demonstrated compliance. Amendment 2 (2024) became mandatory from 23 August 2025, so test programmes for new models need to reflect the amended requirements.
The standard was rewritten because rooftop solar now makes up a large share of generation on the Australian grid. The Australian Energy Market Operator (AEMO) has warned that a significant share of inverters installed under earlier versions did not reliably ride through disturbances. When thousands of small inverters trip at the same moment during a fault, the lost generation can make the disturbance worse. The 2020 edition adds stricter, testable requirements to stop that from happening.
What the Standard Requires Inverters to Do
| Requirement | What it means in practice |
|---|---|
| Regional settings | Inverters ship with selectable settings for Australia A, Australia B, Australia C and New Zealand, each with its own trip limits and response curves. |
| Volt-var and volt-watt | Power quality response modes that must be enabled by default. The inverter absorbs reactive power or curtails output as the local voltage rises. |
| Voltage and frequency limits | Defined trip thresholds and clearing times for under- and over-voltage and under- and over-frequency. |
| Disturbance withstand | The inverter must ride through multiple voltage disturbances, a ROCOF of up to ±4 Hz/s for 0.25 s, and voltage phase-angle jumps of 60° (single phase) or 20° (three phase). |
| Anti-islanding | Active anti-islanding protection that disconnects within 2 seconds when the grid is lost. |
| Reconnection | A delay (typically 60 s) and ramp-up once the grid returns to within limits. |
| Multiple-inverter and export control | Tests for combinations of inverters and for generation and export limit control. |
The Core Test Setup
The test methods in the standard describe the inverter connected between an energy source and a grid source, with defined reference impedance. In a real laboratory that turns into four pieces of equipment.
1. Regenerative grid simulator
The grid simulator stands in for the network. It must output a stable, low-distortion supply at the regional nominal voltage, then step, ramp and distort it on command. For AS/NZS 4777.2 that means programmable voltage and frequency steps with accurate timing, ROCOF ramps, phase-angle jumps and multi-event disturbance sequences. Because the inverter exports into it, it must be regenerative, sinking the full rated output and returning it to the facility supply.
2. PV array simulator or DC source
A PV array simulator reproduces the I-V curve of a real solar array, so the inverter's MPPT tracks it as it would on a roof. Repeatable irradiance profiles matter for power quality response tests, where the inverter must curtail output as voltage rises. For hybrid and battery inverters, a bidirectional DC supply acts as the battery. See our guide to PV inverter I-V curve simulation.
3. RLC load for anti-islanding
Anti-islanding tests use a tuned resistive, inductive and capacitive load that balances the inverter's output so the island is hard to detect. The inverter must still find it and trip within 2 seconds. Our article on anti-islanding testing covers the method in detail.
4. Measurement and automation
A power analyser and high-speed data acquisition record voltage, current, power, reactive power and trip timing. Automation software sequences the hundreds of test points across each regional setting, which is where most of the time in a compliance campaign goes.
Specifying the Grid Simulator
The grid simulator is usually the largest and most important purchase. Check these points against the standard before you buy:
- Power and phases: rated for the largest inverter you will test, with headroom. Three-phase capability with independent per-phase control to test unbalanced conditions.
- Regeneration: full rated power absorption, ideally with high efficiency so energy is returned to the supply rather than dissipated as heat.
- Transient performance: fast slew rate and precise timing for voltage steps, phase-angle jumps and ROCOF ramps. The 2020 edition's withstand tests are where basic AC sources fall short.
- Programmable impedance: the ability to emulate the reference network impedance defined in the standard.
- Built-in test sequences: preloaded AS/NZS 4777.2, IEEE 1547 and IEC tests save weeks of scripting. For LVRT and HVRT work, see our article on the PAS-PFV regenerative grid simulator.
Not sure whether you need a full grid simulator or a programmable AC source will do? Read grid simulator vs programmable AC source.
Beyond Certification: Utilities and Research
Australian network operators and research groups also run AS/NZS 4777.2-style tests. They use them to check how installed inverters behave in practice, to study fleet behaviour during disturbances, and to validate the test methods themselves. Some of this work uses power hardware-in-the-loop setups. In these, a real-time simulator drives an amplifier or grid simulator, so a physical inverter can be tested against a simulated network. Independent testing has shown that some inverters struggle with phase-angle jump tests, which is a good reason to test them thoroughly in the lab.
Building an AS/NZS 4777.2 Test Bench in Australia
Finch supplies and supports regenerative grid simulators, PV array simulators and bidirectional DC sources for inverter compliance, R&D and production test in Australia. We can help you size a bench around the inverters you build or test, from single-phase residential units to three-phase commercial inverters. Browse our grid simulators and PV simulators, or see the full range of programmable power supplies. New to specifying one? Read our guide on how to choose a programmable AC power source.
Frequently Asked Questions
Is AS/NZS 4777.2:2020 mandatory in Australia? Yes. Since 18 December 2021, inverters connected to the grid in Australia must comply with AS/NZS 4777.2:2020 and be listed by the Clean Energy Council to be eligible for small-scale technology certificates. Amendment 2 (2024) became mandatory from 23 August 2025.
What test equipment do I need to test an inverter to AS/NZS 4777.2? At minimum, a programmable grid simulator (regenerative AC source) to act as the grid, a PV array simulator or DC source to act as the energy source, a power analyser and data acquisition, and switching/RLC loads for anti-islanding tests. The grid simulator must be able to reproduce voltage and frequency steps, ROCOF ramps and phase-angle jumps.
Why does the grid simulator need to be regenerative? During most AS/NZS 4777.2 tests the inverter under test is exporting power. A regenerative grid simulator absorbs that power and returns it to the facility supply instead of burning it in resistive loads, which makes continuous full-power testing practical and far cheaper to run.
What are the hardest AS/NZS 4777.2 tests to reproduce? The 2020 edition added disturbance withstand tests: multiple voltage disturbances, a rate of change of frequency of up to 4 Hz/s, and voltage phase-angle shifts of 60 degrees (single phase) and 20 degrees (three phase). These require a grid simulator with fast, precisely timed waveform control rather than a basic AC source.
Can I test hybrid and battery inverters with the same setup? Yes, if the DC side can sink as well as source power. Hybrid and battery inverters need a bidirectional DC source acting as a battery simulator, in addition to (or instead of) a PV array simulator.