Home /
This is some text inside of a div block.
Electronic Loads

Preen ARLC Series

Automated RLC Load Bank for Anti-Islanding Test, 30kW to 250kW per Unit

Anti-islanding testing to IEEE 1547 and 1547.1 requires a load bank capable of simulating a precise local balance between generation and load — the exact condition that would allow a distributed energy resource to continue operating undetected after disconnection from the utility grid. Preen's ARLC Series is purpose-built for this: an automated RLC load bank with independently controlled resistive, inductive, and capacitive elements, available in 30kW, 60kW, 120kW, and 250kW base models.

The independently switched R/L/C loads let the ARLC simulate all four IEEE 1547.1 islanding test conditions — frequency drift, voltage shift, combined drift, and the hardest-to-detect matched-power islanding condition, where load and generation are balanced closely enough that frequency and voltage stay within normal operating limits. Reproducing this matched-power condition accurately and repeatably is the real test of an anti-islanding protection scheme, since a poorly balanced load bank can make islanding either too easy or too hard to detect, giving a misleading pass or fail result.

The modular design supports parallel connection for test programs needing more than a single unit's capacity, and pairing the ARLC with Preen's PAS or ADG power supplies and automation software builds a complete anti-islanding test platform scaling up to 2000kW — relevant for utility-scale inverter and grid-tied generation qualification where test capacity needs to match the actual generation asset being certified.

Preen ARLC Series RLC load bank
Inquire About This Range →
ARLC Series
Available as a Containerized / IP54 Option
Like Preen's BPS shore power series, the ARLC Series can be built into a customized outdoor container or upgraded to an IP54-rated enclosure as an optional configuration — useful for ports, construction sites, remote installations, and other high humidity, heat, dust, or corrosion-exposed environments. Standard indoor chassis remain the default; contact Finch to configure a containerized or IP54 version for your application.
Preen ARLC Series

ARLC Series — Modular RLC Load Bank

Automated RLC load bank for IEEE 1547/1547.1 anti-islanding testing. Four base models from 30kW to 250kW; parallel connection and PAS/ADG pairing scale to 2000kW.
Enquire About This Series →

Technical Specifications

ModelsARLC-30 · ARLC-60 · ARLC-120 · ARLC-250
System ConfigurationIndependently switched Resistive (R), Inductive (L) and Capacitive (C) load banks, managed via computer software
Resistive Load (3-Phase, Adjustable)ARLC-30: 1.5–30kW · ARLC-60: 1.5–60kW · ARLC-120: 3–120kW · ARLC-250: 15–250kW
Inductive Load (3-Phase, Adjustable)ARLC-30: 1.5–30kVA · ARLC-60: 1.5–60kVA · ARLC-120: 3–120kVA · ARLC-250: 15–250kVA
Capacitive Load (3-Phase, Adjustable)ARLC-30: 1.5–30kvar · ARLC-60: 1.5–60kvar · ARLC-120: 3–120kvar · ARLC-250: 15–250kvar
Load StepsARLC-30: 0.5VA · ARLC-60: 0.5VA · ARLC-120: 1VA · ARLC-250: 10VA
Load Input Voltage3-Phase: A) 220/380V · B) 120/208V · C) 277/480V · D) 230/400V · 50Hz or 60Hz
Voltage MeasurementRange: 0–300V · Accuracy: ±0.2% · Resolution: 0.1V
Current MeasurementARLC-30/60: 0–100A · ARLC-120: 0–500A · ARLC-250: 0–1000A · Accuracy ±0.2% on all models
Active / Reactive Power Accuracy±1% accuracy on all models (resolution 0.5W–10.0W depending on model)
Wiring ConfigurationThree-phase four-wire or three-phase three-wire system
Control ModeAutomated control and continuously adjustable RLC load discharge via remote PC
InterfacesEthernet, RS-485 (opt.)
Cooling SystemForced-air cooling
Operating Temperature-10°C to +40°C
Operating Power SupplyAC Single-phase 220V or 120V, 50Hz or 60Hz
Maximum Power ConsumptionARLC-30: 400W · ARLC-60: 600W · ARLC-120: 1600W · ARLC-250: 3200W
WeightARLC-30: approx. 860kg · ARLC-60: approx. 1430kg · ARLC-120: approx. 2400kg · ARLC-250: approx. 4000kg
ExpansionModular design supports parallel connection of multiple units, expandable to 2000kW when paired with PAS/ADG series
ModelCapacityStandard 
ARLC-3030kWIEEE 1547 / 1547.1Enquire
ARLC-6060kWIEEE 1547 / 1547.1Enquire
ARLC-120120kWIEEE 1547 / 1547.1Enquire
ARLC-250250kWIEEE 1547 / 1547.1Enquire

Multiple units connect in parallel for higher capacity; paired with a PAS or ADG power supply and automation software, a complete anti-islanding test system scales up to 2000kW.

Frequently Asked Questions

Why is the matched-power islanding condition the hardest to test for?
Matched-power islanding occurs when local load and generation are balanced closely enough that voltage and frequency stay within an inverter's normal operating window even after grid disconnection, giving the inverter's protection scheme very little deviation to detect. A load bank needs precise, independently controlled R/L/C elements to reproduce this balance accurately and repeatably for a valid test.
What does pairing the ARLC with a PAS or ADG power supply add?
The ARLC provides the load side of the test; combined with a Preen PAS or ADG programmable power supply and automation software, the two form a complete source-and-load anti-islanding test platform capable of running the full IEEE 1547.1 test sequence automatically, scaling to 2000kW for utility-scale qualification work.
Can multiple ARLC units be combined for higher-capacity testing?
Yes — the modular design supports parallel connection of multiple ARLC units, letting a test program scale beyond a single unit's base rating (30kW to 250kW) to match the capacity of the distributed energy resource or generation asset under test.
Send an Enquiry →Send an Enquiry →

Related Reading